62°F
weather icon Clear

Fire station to be remodeled

Boulder City is investing more than $500,000 in upgrades to the city’s fire station, which will provide its employees a safer place to work and allow them to better serve those who live in town.

The footprint of the station will remain the same, and the project includes renovating the conference room, locker room, kitchen areas and floors, according to Boulder City Fire Chief Kevin Nicholson.

In addition, it will provide new energy-efficient light tubes, overhead doors, swamp coolers, technology upgrades, an American with Disabilities Act-compliant entrance and breezeway and an Environmental Protection Agency-required oil separator.

“Although many of the renovations are designed to improve the energy efficiency and ever-increasing maintenance costs of the aging facility, there are other improvements that will address facility access and safety issues,” Nicholson said.

The city has allocated $565,000 for the improvements in this fiscal year’s budget.

The 12,000-square-foot fire station has four garages for trucks and ambulances, along with living quarters for staff who work multiple day shifts.

With all the improvements and changes to the facility, Nicholson said that he is most excited to have a “safe and efficient facility that will support the mission of the department,” which seeks to deliver a high level of fire/rescue and emergency medical services for those in Boulder City.

In addition to helping the fire department better do its job, this project will help the city reduce costs.

“Investing in the upkeep of city facilities not only improves the daily operations for the staff that work in building, but major projects like this reduce the cost to other departments like public works that perform building maintenance,” said Acting City Manager Scott Hansen. “This project will also reduce energy consumption by taking advantage of current technologies.”

The technology upgrades include improving the station’s multimedia capabilities and network connections.

According to Hansen, the city did make some improvements to the station in 2004 with a new addition, and portions of the roof were replaced in 2008 and 2013.

“But this is the first time this area of the station has been remodeled in the 20 years that I have been in Boulder City,” he said.

Like Nicholson, Hansen is looking forward to the updated facility providing a new level of service for the fire department.

“The city owns and maintains over 50 buildings, most of which are older structures,” he said. “It is important to continue to invest in these buildings to preserve them and ensure they provide the functions of the department. The city does not receive enough revenue to properly care for all of the properties the city owns, so we have to prioritize our budget to those buildings with the most immediate needs.”

This project is currently in the design phase, and Nicholson said that they hope to start renovations early in 2018.

Contact reporter Celia Shortt Goodyear at cgoodyear@bouldercityreview.com or at 702-586-9401. Follow her on Twitter @csgoodyear.

THE LATEST
Spring Jamboree this weekend

It’s become one of the most popular annual events in Boulder City and this year is expected to be no different.

Off-road to go on-road?

“They didn’t want the apple, but do they want the orange?” asked Councilmember Sherri Jorgensen. “We’re still talking about fruit here.”

O’Shaughnessy records perfect ACT score

On Feb. 27, BCHS junior Sam O’Shaughnessy walked into the testing room to take the American College Test (better known as the ACT), hoping for a good score. Little did he know he’d walk out having done something just 3,000 students achieve each year – perfection.

Staff advises adding new full-time employees

The Boulder City governmental budget moved a couple of steps closer to its legally-mandated approval at the end of May as the city council heard revised revenue estimates and got requested additional information on a total of eight proposed new positions within the city.

What’s your sign?

In their 1971 hit entitled “Signs”, the 5 Man Electrical Band sang, “Sign, sign, everywhere a sign. Blockin’ out the scenery, breakin’ my mind. Do this, don’t do that, can’t you read the sign?”

Embracing tradition: BCHS’ grad walk celebrates success, unity

In May of 2015, a tradition began at Boulder City High School that has since become a cherished community event… the grad walk. The grad walk was initiated by me during my first year at the helm.

BCHS students win robotics competition

A trip to the workshop for the High Scalers, the robotics team at Boulder City High School in 2024 was much like a visit in 2023. Stuff used to make and practice with the robots built by the team everywhere, six or seven kids gathered there after school and a faculty advisor ensconced in the back of the room at a desk.

Mays in as interim city manager

May 8. That is City Manager Taylour Tedder’s last day working for Boulder City. In other words, Tuesday was Tedder’s final city council meeting.

Council establishes separate pool fund

Things appear to be heating up in terms of motion toward at least initial steps in Boulder City building a new pool. Those steps are not anything that residents will see for a while, but they set the stage.

BCPD closes graffiti case

Thanks to business surveillance cameras, the city’s vigilant license plate reader and “good old-fashioned detective work,” one of the most visible crimes the city has seen this year was solved and arrests made.