67°F
weather icon Clear

Dam power-full: Lake’s level remains high enough for energy generation

Even though the amount of water in Lake Mead continues to decrease, it is not expected to go low enough to stop Hoover Dam’s ability to produce hydropower, according to officials from the Bureau of Reclamation.

Lake Mead is currently operating under a federally declared water shortage and its allocation of water for 2022 has been cut by 21,000 acre feet. The level is also expected to drop 30 feet in the next two years, falling to 1,035.09 feet of water.

Currently, its level is approximately 1,050 feet and it is expected to fall below that soon. Despite that drop, Hoover Dam will still be able to produce hydropower, according Patti Aaron, public affairs officer for the Bureau of Reclamation’s lower Colorado region that oversees the dam’s operations.

“Lake Mead will decline to below 1,050 feet this week, but it will not affect our ability to produce hydropower. … Hoover (Dam) would no longer be able to produce power at 950 feet of elevation,” she said. “We do not anticipate that happening.”

The Southern Nevada Water Authority’s low-lake-level pumping station was also recently put into use in order to secure the area’s access to water.

“We’re the only one in the lower basin (of the Colorado River) that has this security. … We still have access to the water supply but conservation is still important,” said Bronson Mack, SNWA spokesperson.

Mack said conserving outdoor use is especially important because the water is not recycled and put back into Lake Mead. Other ways to conserve are following the seasonal watering restrictions, changing unused grass to water-efficient landscaping and finding and reporting water waste.

The pumping station was completed in April 2020 at a cost of $522 million. It was built to ensure that water flows to the Las Vegas Valley and Boulder City even if the reservoir shrinks to 895 feet to its “dead pool.” At that point, Hoover Dam is unable to release water downstream.

Contact reporter Celia Shortt Goodyear at cgoodyear@bouldercityreview.com or at 702-586-9401. Follow her on Twitter @csgoodyear.

MOST READ
LISTEN TO THE TOP FIVE HERE
THE LATEST
New plan for former Vons

For several years, the former Vons building on Boulder City Parkway has sat empty. But a big step was taken last week to change that.

Council gives Thomas high six-month marks

At just more than six months on the job, City Manager Ned Thomas does not need to be worried about keeping the gig as city council members gathered Wednesday morning for an earlier-than-normal performance evaluation and every comment from every member present (Councilwoman Sherri Jorgensen was absent) could be fairly characterized as stellar.

City votes to join regional council

If one is offered an equal seat at the table on a regional group that advises on policy for an area where that person’s population is equal to .005% of the total region at a cost of $5,000 per year, does that sound like a pretty good deal?

BCPD awarded traffic safety grants

Boulder City Police Department will, once again, be participating in the Joining Forces traffic safety campaign. More than 30 law enforcement agencies across the state of Nevada will team up to focus on traffic safety awareness and enforcement. The campaign series will run from October 2025 through September 2026.

More RV storage? Council approves appraisal for possible future project

The old Vons building is not the only place in the mix for future RV storage. (See story on page 1.) The city is also eyeing a possible future facility in the area where Veterans Memorial Drive and Yucca Street come together.

BCHS takes part in earthquake drill

In a way, it had that Cold War-era feel to it when students a half-century ago were trained to duck and take cover under their desks in the event of a nuclear bomb attack.

Enjoying a (National) Night Out

Photos by Ron Eland/Boulder City Review

Say hello to Liberty Ridge

So, no more Tract 350. Not the project but rather the name.

City pleased with Nevada Way project

It’s been a few weeks since the completion of the roadwork on Nevada Way, and according to the city, they’re happy with the finished product.