69°F
weather icon Windy

Roosevelt puts his stamp on Boulder Dam

I’ve been collecting postage stamps since I was 14 and still enjoy the hobby greatly. Back in the ’80s I joined a new stamp club that was to be for “Worldwiders,” becoming member No. 25 and then vice president of public relations.

Recently, as I was cleaning out boxes, I located the entire publication history of our club newsletter, “The Circuit,” from 1984. The executive director of the International Society of Worldwide Stamp Collectors said it was the only known full set, so I sat down to organize and send it to them.

I couldn’t resist rereading some of the articles, especially from 1993-94, the years I served as president. (I limited it to one term as my job required a lot of travel and it was hard to run a growing club from a hotel room in Liechtenstein.)

One article, titled “That Dam Stamp,” was about the 3 cent stamp issued Sept. 30, 1935, commemorating Boulder Dam. It was written by Ken Jenkins, then-president of the club. Our town was, of course, to be the post office for the first release, a big deal back in those days when stamp collecting was the biggest hobby in the world.

Because of our local connection I decided to share portions of it with you. You may not be familiar with some of the history from the perspective of the stamp release.

Most of you know the lead-up to the story. When the dam project was launched, Herbert Hoover was president and it was named Hoover Dam. It was renamed Boulder Dam shortly after Franklin D. Roosevelt took office. In 1935, the Las Vegas Chamber of Commerce began pushing the idea of a commemorative postage stamp. In April, Interior Secretary Harold Ickes met with Roosevelt and suggested such a stamp, at the request of Nevada Sen. Key Pittman. Roosevelt, being a big stamp collector, liked the idea very much and wanted to design the stamp himself.

Ickes arranged for a photo to be taken from the air half a mile downstream. Ten days after the last concrete had been poured, Roosevelt told Postmaster General James Farley that he wanted a dam stamp to be released in sync with his planned visit to Boulder City on Sept. 28, 1935. After considering five proposed designs, the decision was made in favor of the eventual design, with Boulder Dam prominently bannered across the base of the dam. This was finalized Sept. 13, only 15 days away from the planned visit.

The choice was immediately controversial with former President Hoover and his Republican followers because they felt that the stamp, so named, would fix the Boulder Dam name in the public mind forever. They were pretty much right.

Schooled in Iowa, I still thought the official name was Boulder Dam when I moved here 16 years ago and only then finally understood the proper name.

This timing was preposterous. Designs are normally set six months ahead of the first day of issue. There were then two dozen private companies selling first-day covers that had to take the design and work it into cachets on mailing envelopes that would be printed and trucked to Boulder City for the stamps to be affixed and cancelled. That is, if the stamps were there to affix.

The post office department usually took three weeks to complete an engraving. This time it had 15 days to do the engraving, print half a million stamps and ship them to Boulder City to get them affixed in our tiny little post office.

In Washington, D.C., two engravers worked 12-hour shifts to complete the job in 10 days. World events then lent a hand when Sen. Huey Long was assassinated and Italy invaded Ethiopia, causing the president to delay his trip two days, so the official release was moved to the 30th. That’s why most preprinted first-day covers stated the 28th.

This article doesn’t say how they accomplished the Herculean tasks locally. The post office allowed extra days for the “first day” cancels to be affixed, as late as Oct. 9 in our case. But, does anyone know how we managed to affix and cancel stamps to over 166,000 covers? Dennis McBride maybe?

Dave Nelson retired to Boulder City in 2003 after a career with the FICO score company. He is vice president for the local Sons of Norway.

MOST READ
THE LATEST
We Empower … We Enrich

Empowering our People, Enriching our City: the theme of the State of the City Address.

Getting locked out of house triggers DIY project

Anyone who’s ever accidentally locked themselves out of their house knows that sinking feeling. But locked out while barefoot and in pajamas? That’s the makings of a funny story, however unfunny it appears in the moment.

A look at growth in Boulder City

Due to the Clark County School District’s Change of School Assignment program (COSA) as well as declining resident enrollment, a large percentage of the school’s enrollment comes from outside of Boulder City. For the high school, out of the 618 students, 29%, or 179 kids, come from elsewhere, mostly from Henderson.

Gimme it down to there

About seven weeks ago, I did something that I would not advise for even a healthy dude or dudette in their 30s, much less for a guy who will qualify for Medicare in about eight weeks. I had two pretty major surgical procedures in the space of three days. I know, not a super bright move.

Mahalo for the memories

I’ve mentioned before that one of my more recent stops on my journalism journey was in Hawaii.

Veterans strike out for housing

Tunnel to Towers Foundation is a longtime organization dedicated to building low-cost housing for needy veterans around the nation.

Resolve to be resolute

January is the traditional time for setting New Year’s resolutions.

Council meetings explained

Boulder City is committed to maintaining openness and transparency. City council meetings are critical to our democracy. The city council is the legislative body that discusses and makes decisions on issues affecting our city. The purpose of a city council meeting is to enact ordinances, appropriate funds, set priorities, and establish policies.