104°F
weather icon Thunderstorms

Dam good views thrill bridge inspector

Dangling nearly 900 feet above the Colorado River, Ryan Nataluk deftly rappels down a rope while searching for cracked concrete pillars and corroded steel girders on the Mike O’Callaghan-Pat Tillman Memorial Bridge.

With more than 20 years of experience as a structural engineer and certified mountain climber, Nataluk has no problem with the dizzying height of the nation’s second-highest bridge.

“I love looking down because this is one of the most beautiful areas in the nation, with sweeping views of the Hoover Dam and the Colorado River,” said Nataluk, a bridge inspection manager for Stantec, the company contracted by the Nevada Department of Transportation.

“I love taking in the perspective,” he said. “But it probably isn’t a good job if heights bother you.”

Nataluk is among a team of eight engineers inspecting the arched span, also known as the Hoover Dam bypass bridge and traveled by more than 16,000 vehicles daily. Stantec has a four-year, $9 million contract to inspect roughly 2,000 structures owned by NDOT.

The bridge opened to traffic in October 2010; federal laws require all structures to undergo assessments at least once every two years.

The work is considered routine, but this particular bridge has an added degree of difficulty.

During pre-inspection in late January, Nataluk wore a respirator and wedged himself into a hatch that led to the bridge’s arch. The confined space made it a little hot, but the engineer wanted to make sure the span is secure, both inside and out.

The inspection started Jan. 31, with a lane restriction and sidewalk closures on the Arizona side, and continued through Friday.

The entire sidewalk was closed when the inspection moved to the Nevada side, NDOT spokesman Tony Illia said.

“The bridge is a national monument as much as the Hoover Dam itself,” Nataluk said. “The structure was designed to last for a 100-year lifespan, but I think it’s going to be here a lot longer than that.”

Contact Art Marroquin at amarroquin@reviewjournal.com or 702-383-0336. Find @AMarroquin_LV on Twitter.

MOST READ
LISTEN TO THE TOP FIVE HERE
THE LATEST
Cross county runners look to improve this season

Bringing back a handful of runners who made the 3A state meet a season ago, there’s an optimistic outlook for Boulder City High School cross country this upcoming season.

September offers something for everyone at Boulder City Library

As the heat finally comes down outside, inside the library we have cooked up some amazing events for this upcoming September that we’re excited to tell you all about. No matter what age our patrons are, we pride ourselves on having something for everyone, and our programming schedule for September is no exception.

City grants CUP to Methodist Church

The Boulder City United Methodist Church cleared a major hurdle last week in its desire to build a church of its own; something it’s wished to do for two decades.

Schools welcome new faces on campus

In the blink of an eye, summer vacation for students and faculty from Boulder City’s five public schools was over and school was back in session.

Art in the Park warns of scam

Art in the Park is arguably Boulder City’s biggest event of the year. And with any event of its size comes an opportunity for unscrupulous behavior.

Stankovic scores five goals in victory

Boulder City High School girls soccer advanced to 2-0 on the season, defeating rival Virgin Valley 5-3 on Aug. 19.

Lady Eagles tested early on the court

Boulder City High School girls volleyball advanced to 5-5 on the season, after splitting a pair of games last week.

Looking back on Sept. 11

In just over two weeks, the nation will honor the 25th anniversary of one of the worst days in the history of this country.

Titus, mayor tout project

Saying that “businesses are the lifeblood of our community,” Mayor Joe Hardy helped lead a brief press conference Friday to discuss work to be done as part of Phase II of the Nevada Way Reconstruction Project.