57°F
weather icon Windy

Bureau to install desert landscape

For those who have driven past the Bureau of Reclamation building within the last week, you may have been wondering why it’s surrounded by a chain-link fence.

The answer is simple. The Bureau is in the early stages of replacing its well-known grassy hill with more of a desert landscape in order to save water.

According to Doug Hendrix, public affairs specialist for the Bureau of Reclamation’s Lower Colorado Basin, the Bureau issued a notice to proceed last week to the primary contractor involved in the project. The grass and tree removal process are in progress and will take several weeks to complete. Construction for the xeriscape project is scheduled to continue through October.

Xeriscaping is the practice of designing landscapes to reduce or eliminate the need for irrigation so little or no water beyond what the natural climate provides is necessary.

Removal of several non-native trees began on June 5, with most of the tree and shrub removal being completed by mid-June.

“With Lakes Mead and Powell at historic lows, it is imperative for the Bureau of Reclamation to take the lead in conserving Colorado River water,” he said. “The new landscaping surrounding Reclamation’s buildings will conserve upward of an estimated two million gallons of Colorado River water annually and aligns the agency with the Nevada state law requiring the removal of non-essential turf by 2027.”

The $4.5 million project, funded by the Bipartisan Infrastructure Law, will replace the lawn and associated turf surrounding the facilities with low-water usage vegetation, including drought-tolerant and native trees, shrubs, and plants.

When completed, the regional office grounds will feature a meandering path surrounded by small groves of native plants, trees, and shrubs, Hendrix said. Other amenities will include elevated community gathering spots, drip and low-pressure irrigation systems, and interpretive signs profiling the historic significance of the building and native vegetation placed at the site.

Ron Eland is editor of the Boulder City Review. He can be reached at reland@bouldercityreview.com or at 702-586-9523.

MOST READ
LISTEN TO THE TOP FIVE HERE
THE LATEST
Dump fees set to increase in 2026

Success or failure as a local politician is rarely about big flashy issues.

Council to take another look at second station

Boulder City Councilman Steve Walton has a soft spot for fire departments, especially the local one.

Volunteers place wreaths at cemetery

Saturday, dozens of volunteers turned out to help place thousands of wreaths at the Southern Nevada Veterans Memorial Cemetery as part of the nationwide Wreaths Across America program.

Council nixes Medo’s monster (truck) idea

There was a lot of talking around the issue and trying to be diplomatic. For a while. But, while the discussion centered around the appropriate use of land, in truth the discussion was likely over with the first mention of the term, “monster truck.”

Railroad museum set for spring completion

Construction on the Nevada State Railroad Museum at the busiest intersection in town is progressing at a rapid pace and because of that, is set for a spring completion.

Irrigation project turns off… for now

Readers whose attention span has not been destroyed by TikTok and general social media use may recall that when city council went on for more than an hour talking about where to allow off-leash dog “recreation” options, one of the sticking points was Wilbur Square

Kicking off the season

Photos by Ron Eland/Boulder City Review