81°F
weather icon Mostly Clear

Bureau to install desert landscape

For those who have driven past the Bureau of Reclamation building within the last week, you may have been wondering why it’s surrounded by a chain-link fence.

The answer is simple. The Bureau is in the early stages of replacing its well-known grassy hill with more of a desert landscape in order to save water.

According to Doug Hendrix, public affairs specialist for the Bureau of Reclamation’s Lower Colorado Basin, the Bureau issued a notice to proceed last week to the primary contractor involved in the project. The grass and tree removal process are in progress and will take several weeks to complete. Construction for the xeriscape project is scheduled to continue through October.

Xeriscaping is the practice of designing landscapes to reduce or eliminate the need for irrigation so little or no water beyond what the natural climate provides is necessary.

Removal of several non-native trees began on June 5, with most of the tree and shrub removal being completed by mid-June.

“With Lakes Mead and Powell at historic lows, it is imperative for the Bureau of Reclamation to take the lead in conserving Colorado River water,” he said. “The new landscaping surrounding Reclamation’s buildings will conserve upward of an estimated two million gallons of Colorado River water annually and aligns the agency with the Nevada state law requiring the removal of non-essential turf by 2027.”

The $4.5 million project, funded by the Bipartisan Infrastructure Law, will replace the lawn and associated turf surrounding the facilities with low-water usage vegetation, including drought-tolerant and native trees, shrubs, and plants.

When completed, the regional office grounds will feature a meandering path surrounded by small groves of native plants, trees, and shrubs, Hendrix said. Other amenities will include elevated community gathering spots, drip and low-pressure irrigation systems, and interpretive signs profiling the historic significance of the building and native vegetation placed at the site.

Ron Eland is editor of the Boulder City Review. He can be reached at reland@bouldercityreview.com or at 702-586-9523.

MOST READ
LISTEN TO THE TOP FIVE HERE
THE LATEST
New plan for former Vons

For several years, the former Vons building on Boulder City Parkway has sat empty. But a big step was taken last week to change that.

Council gives Thomas high six-month marks

At just more than six months on the job, City Manager Ned Thomas does not need to be worried about keeping the gig as city council members gathered Wednesday morning for an earlier-than-normal performance evaluation and every comment from every member present (Councilwoman Sherri Jorgensen was absent) could be fairly characterized as stellar.

City votes to join regional council

If one is offered an equal seat at the table on a regional group that advises on policy for an area where that person’s population is equal to .005% of the total region at a cost of $5,000 per year, does that sound like a pretty good deal?

BCPD awarded traffic safety grants

Boulder City Police Department will, once again, be participating in the Joining Forces traffic safety campaign. More than 30 law enforcement agencies across the state of Nevada will team up to focus on traffic safety awareness and enforcement. The campaign series will run from October 2025 through September 2026.

More RV storage? Council approves appraisal for possible future project

The old Vons building is not the only place in the mix for future RV storage. (See story on page 1.) The city is also eyeing a possible future facility in the area where Veterans Memorial Drive and Yucca Street come together.

BCHS takes part in earthquake drill

In a way, it had that Cold War-era feel to it when students a half-century ago were trained to duck and take cover under their desks in the event of a nuclear bomb attack.

Enjoying a (National) Night Out

Photos by Ron Eland/Boulder City Review

Say hello to Liberty Ridge

So, no more Tract 350. Not the project but rather the name.

City pleased with Nevada Way project

It’s been a few weeks since the completion of the roadwork on Nevada Way, and according to the city, they’re happy with the finished product.