77°F
weather icon Clear

Detour on U.S. 95 for bypass bridge starts Sunday

Traffic in Boulder City will get a little more congested this July.

The Regional Transportation Commission of Southern Nevada is redirecting traffic for 1 mile starting near Silverline Road and U.S. Highway 95.

The detour, which begins Sunday and continues through March 2017, is being created for the construction of a bridge for the Interstate 11 bypass.

Traffic on the 1 mile stretch will be reduced to one lane in each direction and the speed limit will drop from 65 mph to 55 mph.

Travelers heading to Laughlin, Nevada, may experience slight delays, but overall the construction will not congest traffic that much, according to the RTC. “The RTC did not take the timing of this construction lightly,” RTC spokesperson Monika Bertaki said. “We did extensive traffic studies on the area and we came to the conclusion that the traffic counts during this time of year are not that high so we won’t have large congestion or bottle necking.”

Drivers are encouraged to drive carefully within the construction zone and follow the speed limit.

I-11 will eventually connect Las Vegas and Phoenix, Arizona. They are the only two cities in the United States with a population of more than 1 million that are not connected by an interstate.

The local stretch of the interstate, also know as the Boulder City bypass, is 15 miles long and is a joint operation between the RTC and the Nevada Department of Transportation.

The project is expected to be completed by fall 2018.

THE LATEST
Spring Jamboree this weekend

It’s become one of the most popular annual events in Boulder City and this year is expected to be no different.

Off-road to go on-road?

“They didn’t want the apple, but do they want the orange?” asked Councilmember Sherri Jorgensen. “We’re still talking about fruit here.”

O’Shaughnessy records perfect ACT score

On Feb. 27, BCHS junior Sam O’Shaughnessy walked into the testing room to take the American College Test (better known as the ACT), hoping for a good score. Little did he know he’d walk out having done something just 3,000 students achieve each year – perfection.

Staff advises adding new full-time employees

The Boulder City governmental budget moved a couple of steps closer to its legally-mandated approval at the end of May as the city council heard revised revenue estimates and got requested additional information on a total of eight proposed new positions within the city.

What’s your sign?

In their 1971 hit entitled “Signs”, the 5 Man Electrical Band sang, “Sign, sign, everywhere a sign. Blockin’ out the scenery, breakin’ my mind. Do this, don’t do that, can’t you read the sign?”

Embracing tradition: BCHS’ grad walk celebrates success, unity

In May of 2015, a tradition began at Boulder City High School that has since become a cherished community event… the grad walk. The grad walk was initiated by me during my first year at the helm.

BCHS students win robotics competition

A trip to the workshop for the High Scalers, the robotics team at Boulder City High School in 2024 was much like a visit in 2023. Stuff used to make and practice with the robots built by the team everywhere, six or seven kids gathered there after school and a faculty advisor ensconced in the back of the room at a desk.

Mays in as interim city manager

May 8. That is City Manager Taylour Tedder’s last day working for Boulder City. In other words, Tuesday was Tedder’s final city council meeting.

Council establishes separate pool fund

Things appear to be heating up in terms of motion toward at least initial steps in Boulder City building a new pool. Those steps are not anything that residents will see for a while, but they set the stage.

BCPD closes graffiti case

Thanks to business surveillance cameras, the city’s vigilant license plate reader and “good old-fashioned detective work,” one of the most visible crimes the city has seen this year was solved and arrests made.