60°F
weather icon Windy

News Briefs

Vons to close Sunday evening for transformation into Haggen

The Vons grocery story at 1031 Nevada Highway will close at 6 p.m. Sunday for its two-day transformation into Haggen.

According to a statement from the Pacific Northwest-based chain, the inside of the building is repainted and the shelves stocked with new products. About 25 percent of the conversion will be complete when the store reopens Tuesday afternoon.

The new store will have a revamped bakery, deli and seafood section, as well as more than doubling the amount of organic produce.

The pharmacy will remain open during the closure, beginning around 11 a.m. Monday and operating during regular pharmacy hours, which are 9 a.m. to 9 p.m. weekdays, and 9 a.m. to 5 p.m. on weekends.

The transformation is the result of Haggen’s acquisition of 146 stores after the Federal Trade Commission approved a merger between Albertsons and Safeway, Vons’ parent company.

Goldstrike Canyon, Arizona Hot Spring trails temporarily closed

A temporary emergency closure has gone into effect for Goldstrike Canyon and Arizona Hot Spring trails in Lake Mead National Recreation Area.

A similar closure was put in place during the summer of 2014 after public safety incidents doubled from 2013. This year, rangers have conducted 14 search and rescues on the two trails, including five in the past week.

“People are miscalculating their ability to hike these strenuous trails in the summer, and it’s not only endangering their lives, it’s endangering the lives of other visitors and rescue crews,” said Patrick Gubbins, the recreation area’s acting superintendent. “These areas will reopen in the fall, when temperatures are cooler.”

During the closure, which began Friday, visitors can still access the hot springs via the Colorado River.

Goldstrike Canyon Trail is on National Park Service and Bureau of Reclamation managed lands, and the agencies are working in partnership on this closure. The National Park Service managed lands will be closed through Sept. 8. The closure on Bureau of Reclamation managed lands in Goldstrike Canyon is in place Monday through Sept. 8.

The area known as White Rock Canyon has multiple trails leading to the Arizona Hot Spring, Liberty Bell Arch and the Colorado River. Goldstrike Canyon is a strenuous hike, requiring bouldering and climbing. It leads to Goldstrike and Nevada hot springs and the Colorado River.

The River Mountains Loop and Historic Railroad trails remain open. Hiking is discouraged during the summer months. Those who choose to hike are encouraged to follow summer safety tips found online at http://www.nps.gov/lake/planyourvisit/summer-hiking.htm.

MOST READ
THE LATEST
Out of this world: A look at Fisher Space Pen

In a popular episode of “Seinfeld,” appropriately entitled “The Pen,” Jerry and Elaine travel to Florida to see his parents. There, a neighbor, Jack Klompus, shows off a pen that the astronauts used in space because of its ability to still write, even when upside-down.

City council approves 15-home Beazer tract

Without any discussion, the city council Tuesday approved a 15-home subdivision as part of a single vote on the consent agenda.

Council approves additional $140K in construction spending

As part of the consent agenda in Tuesday’s meeting, the city council agreed to add about $140,000 to the amount previously agreed to be paid to GCW, Inc. for management, engineering, design and support services for two projects in Boulder City.

UNLV intern joins BCR staff

Beginning this week, the Boulder City Review welcomes Ian Cruz to its staff as an intern for the spring semester.

Metro officer involved in shooting in Boulder City

Dozens of law enforcement officers responded Friday, Jan. 24, to the 700 block of Sixth Street following a reported shooting.

Cost estimates for Substation 3 soar by 141%

Rising costs continue to bedevil city plans for replacing and upgrading infrastructure. The latest example is related to efforts to upgrade Boulder City’s electric utility service as the cost estimates of Substation 3 soared by 141% and the scheduled completion date was pushed out by three full years.

Council forwards energy storage proposal to planning commission

A proposed energy storage facility got a second bite at the apple last week as the city council voted unanimously to forward a new application for a different and smaller plot of land for the project to the planning commission for possible addition to the city’s land use plan.

Mayor touts contributions of others in annual speech

This year’s State of the City address by Mayor Joe Hardy had a new title but continued many of the same themes of teamwork as last year, with a lot more emphasis on the recognition of others.

RR Museum construction underway

For those who have driven by or have stopped at the light at the intersection of Buchanan Boulevard and Boulder City Parkway in the last two weeks, it’s hard not to notice the fencing and construction work currently underway.